All-Saf Fire Protection, Inc. CODE Compliance Guide dry chemical systems


 

Dry Chemical Systems

Monthly

Quarterly

Semi-annual 

Annual

Other 

CODE

NFPA 17

 

Maintenance

 

 

check

 

 

9-3.1

At least semiannually, maintenance shall be conducted in accordance with the manufacturer’s listed installation and maintenance manual.

 

Container Test

 

 

 

 

check

9-5a.

The following parts of dry chemical extinguishing systems shall be subjected to a hydrostatic pressure test at intervals not exceeding 12 years: a. Dry Chemical Containers

 

Hose Test

 

 

 

 

check

9-5c.

The following parts of dry chemical extinguishing systems shall be subjected to a hydrostatic pressure test at intervals not exceeding 12 years: c. Hose Assemblies

 

Agent Examination

 

 

check

 

 

9-3.1d.

Examination of the dry chemical (If there is evidence of caking, the dry chemical shall be discarded and the system shall be recharged in accordance with the manufacturer’s instructions.)

 

Agent Replacement

 

 

 

 

check

9-5.2

Dry chemical agent removed from the containers prior to hydrostatic testing shall be discarded.